Schedule for 2.0

Troy Rollins troy at rpsystems.net
Fri Nov 22 11:34:31 EST 2002


On 11/22/02 11:13 AM, "Kevin Miller" <kevin at runrev.com> wrote:

> First, the not so good news.  Unfortunately, we are running a little later
> than expected.  We want to ensure that 2.0 is in the best possible shape and
> the feature set is well tested.  As such the release is going to be later
> than we originally published, though not by all that much.  We want to get
> it right.  Please bear with us a little longer.

An updated beta sometime soon? Doesn't the feature set need "real world"
testing? (Preferably one with an enabled builder.)

Other than that, don't worry about it. Of all people, it should be this
group that understands software development scheduling issues.


-- 
Troy
RPSystems, Ltd.
www.rpsystems.net




More information about the use-livecode mailing list